Cambridge City Reservoir Dam
Key Takeaway
Cambridge City Reservoir Dam is classified as significant hazard in Ohio. It was completed in 1916 and is 110 years old. Its primary use is water supply. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 47 ft (taller than 89.7% in OH) |
| Dam Length | 476 ft |
| Dam Type | Earth |
| Max Storage | 655 acre-ft |
| Normal Storage | 446 acre-ft |
| Surface Area | 33 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 2,300 cfs |
| Year Completed | 1916 (110 years old) |
| NID ID | OH00043 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
City of Cambridge
Local Government
Nearby Dams
City of Cambridge Park Dam
Guernsey, OH
Significant Hazard 16 ftJohnson Lake Dam
Guernsey, OH
Low Hazard 12 ftIndian Lakes Rec. Area Lower Lake Dam
Guernsey, OH
High Hazard 19 ftIndian Lakes Rec. Area Upper Lake Dam
Guernsey, OH
Significant Hazard 19 ftLuburgh Lake Dam
Guernsey, OH
High Hazard 51 ftSpring Lake Dam
Guernsey, OH
Low Hazard 33 ftSalt Fork Lake Dam
Guernsey, OH
High Hazard 61 ftRitz Lake Dam
Guernsey, OH
Low Hazard 30 ftFrequently Asked Questions
What is the hazard classification of Cambridge City Reservoir Dam?
Cambridge City Reservoir Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Cambridge City Reservoir Dam?
Cambridge City Reservoir Dam is owned by City of Cambridge (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Cambridge City Reservoir Dam built?
Cambridge City Reservoir Dam was completed in 1916, making it 110 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Cambridge City Reservoir Dam?
Cambridge City Reservoir Dam serves the following purposes: Water Supply, Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Cambridge City Reservoir Dam?
Cambridge City Reservoir Dam has a dam height of 47 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Cambridge City Reservoir Dam last inspected?
Cambridge City Reservoir Dam was last inspected on October 21, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.