Byrds Millpond Dam

CEDAR CREEK· Crisp, Georgia· Built 1830· Other· 9 ft tall
Low Hazard Recreation Private

Key Takeaway

Byrds Millpond Dam is classified as low hazard in Georgia. It was completed in 1830 and is 196 years old. Its primary use is recreation.

Physical Details

Dam Height 9 ft (taller than 2.3% in GA)
Dam Length150 ft
Dam TypeOther
Max Storage186 acre-ft
Normal Storage84 acre-ft
Surface Area42 acres
Drainage Area16,000 sq mi
Year Completed1830 (196 years old)
NID IDGA04199

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: March 15, 2017
State Regulated: No

Ownership

Stephens, Harold K.

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Byrds Millpond Dam?

Byrds Millpond Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Byrds Millpond Dam?

Byrds Millpond Dam is owned by Stephens, Harold K. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Byrds Millpond Dam built?

Byrds Millpond Dam was completed in 1830, making it 196 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Byrds Millpond Dam?

Byrds Millpond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Byrds Millpond Dam?

Byrds Millpond Dam has a dam height of 9 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Byrds Millpond Dam last inspected?

Byrds Millpond Dam was last inspected on March 15, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.