Burroughs and Chapin Dam 2
Key Takeaway
Burroughs and Chapin Dam 2 is classified as high hazard in South Carolina. It was completed in 1950 and is 76 years old. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 8 ft (taller than 1.5% in SC) |
| Max Storage | 168 acre-ft |
| Normal Storage | 84 acre-ft |
| Surface Area | 42 acres |
| Year Completed | 1950 (76 years old) |
| NID ID | SC01018 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
BURROUGHS & CHAPIN COMPANY INC
Private
Nearby Dams
Lower Chestnut Lake Dam
Horry, SC
Significant Hazard 8 ftLivingstone Lake Dam
Horry, SC
Significant Hazard 9 ftBurroughs and Chapin Dam 1
Horry, SC
Low Hazard 10 ftLewis Pond Dam
Horry, SC
Low Hazard 7 ftAirport Lagoon Dam
Horry, SC
Low Hazard 11 ftMyrtle Beach Farms CO Dam
Horry, SC
Low Hazard 15 ftFrequently Asked Questions
What is the hazard classification of Burroughs and Chapin Dam 2?
Burroughs and Chapin Dam 2 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Burroughs and Chapin Dam 2?
Burroughs and Chapin Dam 2 is owned by BURROUGHS & CHAPIN COMPANY INC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Burroughs and Chapin Dam 2 built?
Burroughs and Chapin Dam 2 was completed in 1950, making it 76 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Burroughs and Chapin Dam 2?
Burroughs and Chapin Dam 2 serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Burroughs and Chapin Dam 2?
Burroughs and Chapin Dam 2 has a dam height of 8 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Burroughs and Chapin Dam 2 last inspected?
Burroughs and Chapin Dam 2 was last inspected on January 26, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.