Broken Aro Sediment Pond No. 46 Dam
Key Takeaway
Broken Aro Sediment Pond No. 46 Dam is classified as low hazard in Ohio. It was completed in 1980 and is 46 years old. Its primary use is recreation.
Physical Details
| Dam Height | 30 ft (taller than 61.5% in OH) |
| Dam Length | 305 ft |
| Dam Type | Earth |
| Max Storage | 43 acre-ft |
| Normal Storage | 22 acre-ft |
| Surface Area | 1 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 936 cfs |
| Year Completed | 1980 (46 years old) |
| NID ID | OH01449 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
ODNR, Division of Wildlife
State Government
Nearby Dams
Broken Aro Sediment Pond No. 47 Dam
Coshocton, OH
Low Hazard 40 ftPeabody Coal Company Pond Dam
Coshocton, OH
Significant Hazard 34 ftCatfish Ii Dam
Coshocton, OH
Significant Hazard 25 ftBroken Aro Slurry Pond No. 1 Dam
Coshocton, OH
Significant Hazard 49 ftSix-Mile Dam
Coshocton, OH
High Hazard 28 ftSunset Lake Dam
Coshocton, OH
High Hazard 27 ftMoore Lake Dam
Coshocton, OH
Low Hazard 16 ftMonroe Basin Dam
Muskingum, OH
Low Hazard 14 ftFrequently Asked Questions
What is the hazard classification of Broken Aro Sediment Pond No. 46 Dam?
Broken Aro Sediment Pond No. 46 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Broken Aro Sediment Pond No. 46 Dam?
Broken Aro Sediment Pond No. 46 Dam is owned by ODNR, Division of Wildlife (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Broken Aro Sediment Pond No. 46 Dam built?
Broken Aro Sediment Pond No. 46 Dam was completed in 1980, making it 46 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Broken Aro Sediment Pond No. 46 Dam?
Broken Aro Sediment Pond No. 46 Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Broken Aro Sediment Pond No. 46 Dam?
Broken Aro Sediment Pond No. 46 Dam has a dam height of 30 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Broken Aro Sediment Pond No. 46 Dam last inspected?
Broken Aro Sediment Pond No. 46 Dam was last inspected on October 10, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.