Bridlewood Upper Dam
Key Takeaway
Bridlewood Upper Dam is classified as unknown in South Carolina. It was completed in 1977 and is 49 years old. Its primary use is recreation.
Physical Details
| Dam Height | 10 ft (taller than 5.2% in SC) |
| Max Storage | 60 acre-ft |
| Normal Storage | 39 acre-ft |
| Surface Area | 7 acres |
| Year Completed | 1977 (49 years old) |
| NID ID | SC01853 |
Safety Information
Hazard potential has not been determined.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Not Listed
Nearby Dams
Bridlewood Lower Dam
Chesterfield, SC
Significant Hazard 25 ftEdwards/Kendall Dam
Chesterfield, SC
Low Hazard 18 ftClyde Laney Pond Dam
Chesterfield, SC
Low Hazard 13 ftEskridge Pond Dam
Chesterfield, SC
Unknown 16 ftTeal Millpond Dam
Chesterfield, SC
Low Hazard 15 ftLc Reid Pond Dam
Chesterfield, SC
Low Hazard 34 ftRobeson Millpond Dam
Chesterfield, SC
Low Hazard 13 ftChatham Lake Dam
Chesterfield, SC
High Hazard 17 ftFrequently Asked Questions
What is the hazard classification of Bridlewood Upper Dam?
Bridlewood Upper Dam is classified as Unknown. Hazard potential has not been determined. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Bridlewood Upper Dam?
Bridlewood Upper Dam is owned by information not available (Not Listed). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Bridlewood Upper Dam built?
Bridlewood Upper Dam was completed in 1977, making it 49 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Bridlewood Upper Dam?
Bridlewood Upper Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Bridlewood Upper Dam?
Bridlewood Upper Dam has a dam height of 10 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Bridlewood Upper Dam last inspected?
Bridlewood Upper Dam was last inspected on January 28, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.