Boyd'S Millpond Dam

REEDY RIVER· Laurens, South Carolina· Built 1909· 36 ft tall
High Hazard Hydroelectric Private

Key Takeaway

Boyd'S Millpond Dam is classified as high hazard in South Carolina. It was completed in 1909 and is 117 years old. Its primary use is hydroelectric. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Height 36 ft (taller than 88.9% in SC)
Max Storage3.1K acre-ft
Normal Storage3.0K acre-ft
Surface Area185 acres
Year Completed1909 (117 years old)
NID IDSC01066

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: November 22, 2022
State Regulated: Yes
Regulatory Agency: SC DHEC

Ownership

NORTHBROOK CAROLINA HYDRO LLC

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Boyd'S Millpond Dam?

Boyd'S Millpond Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Boyd'S Millpond Dam?

Boyd'S Millpond Dam is owned by NORTHBROOK CAROLINA HYDRO LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Boyd'S Millpond Dam built?

Boyd'S Millpond Dam was completed in 1909, making it 117 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Boyd'S Millpond Dam?

Boyd'S Millpond Dam serves the following purposes: Hydroelectric. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Boyd'S Millpond Dam?

Boyd'S Millpond Dam has a dam height of 36 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Boyd'S Millpond Dam last inspected?

Boyd'S Millpond Dam was last inspected on November 22, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.