Bowmans Marsh
Key Takeaway
Bowmans Marsh is classified as low hazard in Pennsylvania. Its primary use is recreation.
Physical Details
| Dam Height | 10 ft (taller than 8.3% in PA) |
| Dam Length | 220 ft |
| Dam Type | Earth |
| Max Storage | 125 acre-ft |
| Normal Storage | 9 acre-ft |
| Surface Area | 16 acres |
| Drainage Area | 2 sq mi |
| NID ID | PA01645 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
PA GAME COMMISSION
State Government
Nearby Dams
Lake Jean
Luzerne, PA
High Hazard 26 ftSplash
Sullivan, PA
Low Hazard 10 ftLake John
Sullivan, PA
Low Hazard 15 ftHarris Pond
Luzerne, PA
High Hazard 10 ftFoster Pond
Sullivan, PA
Low Hazard 11 ftPainter Den Pond
Sullivan, PA
Low Hazard 10 ftHidden Lake
Luzerne, PA
Significant Hazard 20 ftConnell
Sullivan, PA
Low Hazard 18 ftFrequently Asked Questions
What is the hazard classification of Bowmans Marsh?
Bowmans Marsh is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Bowmans Marsh?
Bowmans Marsh is owned by PA GAME COMMISSION (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Bowmans Marsh?
Bowmans Marsh serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Bowmans Marsh?
Bowmans Marsh has a dam height of 10 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Bowmans Marsh last inspected?
Bowmans Marsh was last inspected on July 27, 2016. Inspection dates indicate when a formal review occurred, not the results of that inspection.