Bitterroot No. 1
Key Takeaway
Bitterroot No. 1 is classified as low hazard in Wyoming. It was completed in 1977 and is 49 years old. Its primary use is irrigation.
Physical Details
| Dam Height | 33 ft (taller than 75.3% in WY) |
| Dam Length | 440 ft |
| Dam Type | Earth |
| Normal Storage | 24 acre-ft |
| Surface Area | 3 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 1,312 cfs |
| Year Completed | 1977 (49 years old) |
| NID ID | WY01510 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
BITTERROOT RANCH LIMITED PARTNERSHIP
Private
Frequently Asked Questions
What is the hazard classification of Bitterroot No. 1?
Bitterroot No. 1 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Bitterroot No. 1?
Bitterroot No. 1 is owned by BITTERROOT RANCH LIMITED PARTNERSHIP (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Bitterroot No. 1 built?
Bitterroot No. 1 was completed in 1977, making it 49 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Bitterroot No. 1?
Bitterroot No. 1 serves the following purposes: Irrigation, Fish And Wildlife Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Bitterroot No. 1?
Bitterroot No. 1 has a dam height of 33 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Bitterroot No. 1 last inspected?
Bitterroot No. 1 was last inspected on May 11, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.