Berenda Slough
Key Takeaway
Berenda Slough is classified as high hazard in California. It was completed in 1962 and is 64 years old. Its primary use is other. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 21 ft (taller than 17.3% in CA) |
| Dam Length | 1,040 ft |
| Dam Type | Earth |
| Max Storage | 2.5K acre-ft |
| Surface Area | 230 acres |
| Drainage Area | 283 sq mi |
| Year Completed | 1962 (64 years old) |
| NID ID | CA00835 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Chowchilla Water District
Public Utility
Nearby Dams
Frequently Asked Questions
What is the hazard classification of Berenda Slough?
Berenda Slough is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Berenda Slough?
Berenda Slough is owned by Chowchilla Water District (Public Utility). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Berenda Slough built?
Berenda Slough was completed in 1962, making it 64 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Berenda Slough?
Berenda Slough serves the following purposes: Other, Irrigation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Berenda Slough?
Berenda Slough has a dam height of 21 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Berenda Slough last inspected?
Berenda Slough was last inspected on September 14, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.