Bany Lake Dam
Key Takeaway
Bany Lake Dam is classified as low hazard in Georgia. Its primary use is fire protection.
Physical Details
| Dam Height | 13 ft (taller than 12.9% in GA) |
| Dam Length | 615 ft |
| Dam Type | Earth |
| Max Storage | 189 acre-ft |
| Normal Storage | 84 acre-ft |
| Surface Area | 21 acres |
| Drainage Area | 325 sq mi |
| NID ID | GA03462 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Lasuda Farms LLC
Private
Nearby Dams
Bowen Irrigation Pond East
Tift, GA
Low Hazard 10 ftStone Lake Dam
Tift, GA
Low Hazard 9 ftBowen Lake Dam
Tift, GA
Low Hazard 9 ftCoarsey Lake Dam
Tift, GA
Low Hazard 15 ftBakers Pond Lake Dam
Tift, GA
Low Hazard 10 ftMccrainie Lake Dam
Tift, GA
Low Hazard 14 ftRonald Brownlee Dam
Tift, GA
Low Hazard 15 ftWilliam Hayes Lake Dam
Tift, GA
Low Hazard 12 ftFrequently Asked Questions
What is the hazard classification of Bany Lake Dam?
Bany Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Bany Lake Dam?
Bany Lake Dam is owned by Lasuda Farms LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Bany Lake Dam?
Bany Lake Dam serves the following purposes: Fire Protection, Stock, Or Small Fish Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Bany Lake Dam?
Bany Lake Dam has a dam height of 13 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Bany Lake Dam last inspected?
Bany Lake Dam was last inspected on November 1, 2010. Inspection dates indicate when a formal review occurred, not the results of that inspection.