Yellow Creek Dam
Key Takeaway
Yellow Creek Dam is classified as low hazard in Michigan. It was completed in 1948 and is 78 years old. Its primary use is irrigation.
Physical Details
| Dam Height | 19 ft (taller than 67.3% in MI) |
| Dam Length | 150 ft |
| Dam Type | Earth |
| Max Storage | 75 acre-ft |
| Normal Storage | 65 acre-ft |
| Surface Area | 3 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 114 cfs |
| Year Completed | 1948 (78 years old) |
| NID ID | MI02186 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Point O' Woods Golf & Country Club
Private
Nearby Dams
Frequently Asked Questions
What is the hazard classification of Yellow Creek Dam?
Yellow Creek Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Yellow Creek Dam?
Yellow Creek Dam is owned by Point O' Woods Golf & Country Club (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Yellow Creek Dam built?
Yellow Creek Dam was completed in 1948, making it 78 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Yellow Creek Dam?
Yellow Creek Dam serves the following purposes: Irrigation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Yellow Creek Dam?
Yellow Creek Dam has a dam height of 19 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Yellow Creek Dam last inspected?
Yellow Creek Dam was last inspected on September 26, 2014. Inspection dates indicate when a formal review occurred, not the results of that inspection.