Wire and Nail Factory

CEDAR CREEK· Ozaukee, Wisconsin· Built 1934· Arch· 28 ft tall
Low Hazard Hydroelectric Private

Key Takeaway

Wire and Nail Factory is classified as low hazard in Wisconsin. It was completed in 1934 and is 92 years old. Its primary use is hydroelectric.

Physical Details

Dam Height 28 ft (taller than 77.3% in WI)
Dam Length83 ft
Dam TypeArch
Max Storage27 acre-ft
Normal Storage17 acre-ft
Surface Area2 acres
Drainage Area125 sq mi
Max Discharge2,350 cfs
Year Completed1934 (92 years old)
NID IDWI12423

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: October 11, 2013
State Regulated: Yes
Regulatory Agency: WIDNR

Ownership

Cedarburg Hydro Electric Corp

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Wire and Nail Factory?

Wire and Nail Factory is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Wire and Nail Factory?

Wire and Nail Factory is owned by Cedarburg Hydro Electric Corp (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Wire and Nail Factory built?

Wire and Nail Factory was completed in 1934, making it 92 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Wire and Nail Factory?

Wire and Nail Factory serves the following purposes: Hydroelectric. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Wire and Nail Factory?

Wire and Nail Factory has a dam height of 28 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Wire and Nail Factory last inspected?

Wire and Nail Factory was last inspected on October 11, 2013. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.