Winchester Club Pond Dam
Key Takeaway
Winchester Club Pond Dam is classified as significant hazard in Connecticut. It was completed in 1927 and is 99 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 9 ft (taller than 24.9% in CT) |
| Dam Length | 170 ft |
| Dam Type | Earth |
| Max Storage | 98 acre-ft |
| Normal Storage | 98 acre-ft |
| Surface Area | 230 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 39 cfs |
| Year Completed | 1927 (99 years old) |
| NID ID | CT00107 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Winchester Fish & Game Club, Inc.
Private
Nearby Dams
Camp Delaware Dam
Litchfield, CT
Significant Hazard 10 ftCrystal Lake Reservoir Dam
Litchfield, CT
Significant Hazard 13 ftMorin Pond Dam #2
Litchfield, CT
Significant Hazard 13 ftRugg Brook Reservoir Dam
Litchfield, CT
Significant Hazard 36 ftSucker Brook Flood Control Dam
Litchfield, CT
High Hazard 68 ftWinchester Lake Dam
Litchfield, CT
Significant Hazard 23 ftPark Pond Dam
Litchfield, CT
High Hazard 20 ftLost Pond Dam
Litchfield, CT
Significant Hazard 13 ftFrequently Asked Questions
What is the hazard classification of Winchester Club Pond Dam?
Winchester Club Pond Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Winchester Club Pond Dam?
Winchester Club Pond Dam is owned by Winchester Fish & Game Club, Inc. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Winchester Club Pond Dam built?
Winchester Club Pond Dam was completed in 1927, making it 99 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Winchester Club Pond Dam?
Winchester Club Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Winchester Club Pond Dam?
Winchester Club Pond Dam has a dam height of 9 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.