Willow Run Farm Dam is classified as significant hazard in North Carolina. It was completed in 1978 and is 48 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.

Physical Details

Dam Length150 ft
Dam TypeEarth
Max Storage14 acre-ft
Normal Storage9 acre-ft
Surface Area1 acres
Drainage Area16 sq mi
Year Completed1978 (48 years old)
NID IDNC03028

Safety Information

Significant Hazard

No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: January 9, 2023
State Regulated: Yes
Regulatory Agency: NCDEQ, DEMLR, Dam Safety Program

Ownership

Steve Torcie

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Willow Run Farm Dam?

Willow Run Farm Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Willow Run Farm Dam?

Willow Run Farm Dam is owned by Steve Torcie (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Willow Run Farm Dam built?

Willow Run Farm Dam was completed in 1978, making it 48 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Willow Run Farm Dam?

Willow Run Farm Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

When was Willow Run Farm Dam last inspected?

Willow Run Farm Dam was last inspected on January 9, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.