West End Beagle Club Dam
Key Takeaway
West End Beagle Club Dam is classified as significant hazard in Massachusetts. It was completed in 1962 and is 64 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 13 ft (taller than 39.5% in MA) |
| Dam Length | 150 ft |
| Dam Type | Concrete |
| Max Storage | 59 acre-ft |
| Normal Storage | 42 acre-ft |
| Surface Area | 9 acres |
| Drainage Area | 3 sq mi |
| Year Completed | 1962 (64 years old) |
| NID ID | MA00926 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
WEST END BEAGLE CLUB
Private
Nearby Dams
Perley Brook Reservoir Dam
Worcester, MA
High Hazard 50 ftParker Pond Dam
Worcester, MA
Significant Hazard 20 ftHilchey Pond Dam
Worcester, MA
Significant Hazard 11 ftCowee Pond Dam
Worcester, MA
High Hazard 15 ftRamsdall Pond Dam
Worcester, MA
Significant Hazard 9 ftDunn Pond Dam
Worcester, MA
Significant Hazard 13 ftMahoney Pond Dam
Worcester, MA
Significant Hazard 10 ftRidgley Pond Dam
Worcester, MA
Significant Hazard 12 ftFrequently Asked Questions
What is the hazard classification of West End Beagle Club Dam?
West End Beagle Club Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates West End Beagle Club Dam?
West End Beagle Club Dam is owned by WEST END BEAGLE CLUB (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was West End Beagle Club Dam built?
West End Beagle Club Dam was completed in 1962, making it 64 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of West End Beagle Club Dam?
West End Beagle Club Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is West End Beagle Club Dam?
West End Beagle Club Dam has a dam height of 13 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was West End Beagle Club Dam last inspected?
West End Beagle Club Dam was last inspected on November 16, 2015. Inspection dates indicate when a formal review occurred, not the results of that inspection.