Key Takeaway
Verney Mill Hydro Dam is classified as high hazard in New Hampshire. It was completed in 1916 and is 110 years old. Its primary use is hydroelectric. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 25 ft (taller than 80.2% in NH) |
| Dam Length | 280 ft |
| Dam Type | Concrete |
| Max Storage | 16 acre-ft |
| Normal Storage | 7 acre-ft |
| Surface Area | 2 acres |
| Drainage Area | 44 sq mi |
| Year Completed | 1916 (110 years old) |
| NID ID | NH00825 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
US ARMY CORP OF ENGINEERS
Federal Government
Nearby Dams
Edward MacDowell Dam
Hillsborough, NH
High Hazard 63 ftUnion Street
Hillsborough, NH
Significant Hazard 15 ftMiddle Hancock LLC Dam
Hillsborough, NH
Low Hazard 9 ftMud Pond Dam
Cheshire, NH
Low Hazard 18 ftNoone Mills
Hillsborough, NH
Significant Hazard 14 ftSargent Center Infiltration Lagoon
Hillsborough, NH
Significant Hazard 11 ftNorth Village Dam
Hillsborough, NH
Low Hazard 12 ftCommerce Park Wildlife Pond Dam
Hillsborough, NH
Low Hazard 10 ftFrequently Asked Questions
What is the hazard classification of Verney Mill Hydro Dam?
Verney Mill Hydro Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Verney Mill Hydro Dam?
Verney Mill Hydro Dam is owned by US ARMY CORP OF ENGINEERS (Federal Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Verney Mill Hydro Dam built?
Verney Mill Hydro Dam was completed in 1916, making it 110 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Verney Mill Hydro Dam?
Verney Mill Hydro Dam serves the following purposes: Hydroelectric. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Verney Mill Hydro Dam?
Verney Mill Hydro Dam has a dam height of 25 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Verney Mill Hydro Dam last inspected?
Verney Mill Hydro Dam was last inspected on September 12, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.