Valley Pond Dam
Key Takeaway
Valley Pond Dam is classified as significant hazard in Massachusetts. It was completed in 1962 and is 64 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 14 ft (taller than 45.2% in MA) |
| Dam Length | 690 ft |
| Dam Type | Earth |
| Max Storage | 138 acre-ft |
| Normal Storage | 105 acre-ft |
| Surface Area | 0 acres |
| Drainage Area | 1 sq mi |
| Year Completed | 1962 (64 years old) |
| NID ID | MA01104 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
VALLEY POND CORPORATION
Private
Nearby Dams
Valley Pond Dike
Middlesex, MA
Significant Hazard 11 ftHobbs Pond Dam
Middlesex, MA
Low Hazard 9 ftCambridge Reservoir Dam
Middlesex, MA
High Hazard 31 ftCrosby Pond Dam
Middlesex, MA
Significant Hazard 9 ftWeston Reservoir Dam
Middlesex, MA
High Hazard 45 ftStony Brook Reservoir Dam
Middlesex, MA
High Hazard 32 ftLexington Reservoir Dam
Middlesex, MA
Significant Hazard 11 ftMoody Street Dam
Middlesex, MA
High Hazard 22 ftFrequently Asked Questions
What is the hazard classification of Valley Pond Dam?
Valley Pond Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Valley Pond Dam?
Valley Pond Dam is owned by VALLEY POND CORPORATION (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Valley Pond Dam built?
Valley Pond Dam was completed in 1962, making it 64 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Valley Pond Dam?
Valley Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Valley Pond Dam?
Valley Pond Dam has a dam height of 14 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Valley Pond Dam last inspected?
Valley Pond Dam was last inspected on July 18, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.