Upper Buffalo No.22 Dam is classified as high hazard in West Virginia. It was completed in 1975 and is 51 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 62 ft (taller than 65.6% in WV) |
| Dam Length | 366 ft |
| Dam Type | Earth |
| Max Storage | 755 acre-ft |
| Normal Storage | 88 acre-ft |
| Surface Area | 7 acres |
| Drainage Area | 2 sq mi |
| Max Discharge | 7,639 cfs |
| Year Completed | 1975 (51 years old) |
| NID ID | WV04919 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Local Government
Nearby Dams
Upper Buffalo #33a Dam
Marion, WV
High Hazard 51 ftUpper Buffalo No.16
Marion, WV
High Hazard 68 ftUpper Buffalo No.39
Marion, WV
High Hazard 57 ftLewellyn Amd Impoundment
Marion, WV
High Hazard 122 ftMannington Water Supply Dam
Marion, WV
High Hazard 56 ftUpper Buffalo Creek 37A
Marion, WV
High Hazard 54 ftUpper Buffalo No.2
Marion, WV
High Hazard 58 ftHarvey Run No. 2 Slurry Impoundment
Monongalia, WV
High Hazard 83 ftFrequently Asked Questions
What is the hazard classification of Upper Buffalo No.22 Dam?
Upper Buffalo No.22 Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Upper Buffalo No.22 Dam?
Upper Buffalo No.22 Dam is owned by information not available (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Upper Buffalo No.22 Dam built?
Upper Buffalo No.22 Dam was completed in 1975, making it 51 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Upper Buffalo No.22 Dam?
Upper Buffalo No.22 Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Upper Buffalo No.22 Dam?
Upper Buffalo No.22 Dam has a dam height of 62 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Upper Buffalo No.22 Dam last inspected?
Upper Buffalo No.22 Dam was last inspected on June 30, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.