Unnamed Dam
Key Takeaway
Unnamed Dam is classified as low hazard in Florida. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 13 ft (taller than 24.8% in FL) |
| Dam Length | 690 ft |
| Dam Type | Earth |
| Max Storage | 218 acre-ft |
| Normal Storage | 32 acre-ft |
| Surface Area | 19 acres |
| Drainage Area | 4 sq mi |
| NID ID | FL69003 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
STONERIDGE FARMS, INC
Private
Nearby Dams
Doctors Lake Dam
Clay, FL
Significant Hazard 12 ftUnnamed Dam
Clay, FL
Significant Hazard 10 ftWright S Dam
Clay, FL
Significant Hazard 25 ftLake Asbury Dam
Clay, FL
High Hazard 31 ftLake Asbury South Dam
Clay, FL
High Hazard 31 ftLark Lake Dam
Clay, FL
Significant Hazard 21 ftLake Larc Dam
Clay, FL
High Hazard 17 ftLake Ryan Dam
Clay, FL
High Hazard 29 ftFrequently Asked Questions
What is the hazard classification of Unnamed Dam?
Unnamed Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Unnamed Dam?
Unnamed Dam is owned by STONERIDGE FARMS, INC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Unnamed Dam?
Unnamed Dam serves the following purposes: Flood Risk Reduction, Recreation, Water Supply. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Unnamed Dam?
Unnamed Dam has a dam height of 13 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Unnamed Dam last inspected?
Unnamed Dam was last inspected on May 9, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.