Key Takeaway
Tropicana North Branch Detention Basin Dam is classified as high hazard in Nevada. It was completed in 2011 and is 15 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 20 ft (taller than 40.8% in NV) |
| Dam Length | 1,244 ft |
| Dam Type | Earth |
| Max Storage | 65 acre-ft |
| Normal Storage | 0 acre-ft |
| Surface Area | 5 acres |
| Drainage Area | 2 sq mi |
| Max Discharge | 3,006 cfs |
| Year Completed | 2011 (15 years old) |
| NID ID | NV10731 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
CLARK COUNTY PUBLIC WORKS
Local Government
Nearby Dams
Flamingo Wash Lower Detention Basin Dam
Clark, NV
High Hazard 20 ftTropicana Detention Basin Dam
Clark, NV
High Hazard 39 ftBlue Diamond Business Center Detention Basin Dam #1
Clark, NV
High Hazard 18 ftDesert Inn Detention Basin Dam
Clark, NV
High Hazard 17 ftLower Blue Diamond Detention Dam
Clark, NV
High Hazard 12 ftOakey Detention Dam
Clark, NV
High Hazard 19 ftFlamingo Wash Upper Detention Basin Dam
Clark, NV
High Hazard 45 ftMeadows Detention Basin Dam
Clark, NV
High Hazard 17 ftFrequently Asked Questions
What is the hazard classification of Tropicana North Branch Detention Basin Dam?
Tropicana North Branch Detention Basin Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Tropicana North Branch Detention Basin Dam?
Tropicana North Branch Detention Basin Dam is owned by CLARK COUNTY PUBLIC WORKS (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Tropicana North Branch Detention Basin Dam built?
Tropicana North Branch Detention Basin Dam was completed in 2011, making it 15 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Tropicana North Branch Detention Basin Dam?
Tropicana North Branch Detention Basin Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Tropicana North Branch Detention Basin Dam?
Tropicana North Branch Detention Basin Dam has a dam height of 20 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Tropicana North Branch Detention Basin Dam last inspected?
Tropicana North Branch Detention Basin Dam was last inspected on May 3, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.