Ticoa Lake Dam
Key Takeaway
Ticoa Lake Dam is classified as high hazard in North Carolina. It was completed in 1974 and is 52 years old. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 728 ft |
| Dam Type | Earth |
| Max Storage | 2.4K acre-ft |
| Normal Storage | 1.9K acre-ft |
| Surface Area | 75 acres |
| Drainage Area | 766 sq mi |
| Max Discharge | 4,400 cfs |
| Year Completed | 1974 (52 years old) |
| NID ID | NC00199 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Connestee Falls POA, Inc.
Private
Nearby Dams
Lake Tiaroga Dam
Transylvania, NC
High HazardAtagahi Lake Dam
Transylvania, NC
High HazardLake Megan Dam
Transylvania, NC
High HazardHamlin Lake Dam
Transylvania, NC
Significant HazardCalico Lake Dam
Transylvania, NC
High HazardSlick Rock Mountain Dam
Transylvania, NC
Significant HazardNorth Shore Lake Dam
Transylvania, NC
Significant HazardWilson Pond Dam
Transylvania, NC
Significant HazardFrequently Asked Questions
What is the hazard classification of Ticoa Lake Dam?
Ticoa Lake Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Ticoa Lake Dam?
Ticoa Lake Dam is owned by Connestee Falls POA, Inc. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Ticoa Lake Dam built?
Ticoa Lake Dam was completed in 1974, making it 52 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Ticoa Lake Dam?
Ticoa Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Ticoa Lake Dam last inspected?
Ticoa Lake Dam was last inspected on March 8, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.