Three Mile Creek (Perry City Fcd) Db

THREEMILE CREEK· Box Elder, Utah· Built 1930· Earth·
High Hazard Flood Risk Reduction Local Government

Key Takeaway

Three Mile Creek (Perry City Fcd) Db is classified as high hazard in Utah. It was completed in 1930 and is 96 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Length780 ft
Dam TypeEarth
Max Storage21 acre-ft
Normal Storage14 acre-ft
Drainage Area5 sq mi
Year Completed1930 (96 years old)
NID IDUT00573

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: May 24, 2023
State Regulated: Yes
Regulatory Agency: Utah Division of Water Rights

Ownership

PERRY FLOOD CONTROL DISTRICT

Local Government

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Three Mile Creek (Perry City Fcd) Db?

Three Mile Creek (Perry City Fcd) Db is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Three Mile Creek (Perry City Fcd) Db?

Three Mile Creek (Perry City Fcd) Db is owned by PERRY FLOOD CONTROL DISTRICT (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Three Mile Creek (Perry City Fcd) Db built?

Three Mile Creek (Perry City Fcd) Db was completed in 1930, making it 96 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Three Mile Creek (Perry City Fcd) Db?

Three Mile Creek (Perry City Fcd) Db serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

When was Three Mile Creek (Perry City Fcd) Db last inspected?

Three Mile Creek (Perry City Fcd) Db was last inspected on May 24, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.