Taftville Reservoir #1 Dam
Key Takeaway
Taftville Reservoir #1 Dam is classified as significant hazard in Connecticut. It was completed in 1880 and is 146 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 30 ft (taller than 87.9% in CT) |
| Dam Length | 1,085 ft |
| Dam Type | Earth |
| Surface Area | 17 acres |
| Drainage Area | 0 sq mi |
| Year Completed | 1880 (146 years old) |
| NID ID | CT00207 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
City of Norwich
Local Government
Nearby Dams
Taftville Reservoir #2 Dam
New London, CT
Significant Hazard 30 ftSpaulding Pond Dike
New London, CT
High Hazard 16 ftFairview Reservoir Dam and Dikes
New London, CT
High Hazard 30 ftTaftville Reservoir #3 Dam
New London, CT
Significant Hazard 15 ftSkating Pond Dam
New London, CT
High Hazard 16 ftTaftville Hydro Dam #4
New London, CT
High Hazard 30 ftTunnel Dam Hydro Station
New London, CT
Significant Hazard 32 ftBlissville Pond Dam
New London, CT
Low Hazard 11 ftFrequently Asked Questions
What is the hazard classification of Taftville Reservoir #1 Dam?
Taftville Reservoir #1 Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Taftville Reservoir #1 Dam?
Taftville Reservoir #1 Dam is owned by City of Norwich (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Taftville Reservoir #1 Dam built?
Taftville Reservoir #1 Dam was completed in 1880, making it 146 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Taftville Reservoir #1 Dam?
Taftville Reservoir #1 Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Taftville Reservoir #1 Dam?
Taftville Reservoir #1 Dam has a dam height of 30 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Taftville Reservoir #1 Dam last inspected?
Taftville Reservoir #1 Dam was last inspected on September 4, 2013. Inspection dates indicate when a formal review occurred, not the results of that inspection.