Springfield Coal/Orient 6 /South Slurry Cell Dam

TRIB EAST HURRICANE CREEK· Jefferson, Illinois· Built 1985· Earth· 54 ft tall
Significant Hazard Other Private

Key Takeaway

Springfield Coal/Orient 6 /South Slurry Cell Dam is classified as significant hazard in Illinois. It was completed in 1985 and is 41 years old. Its primary use is other. Significant hazard means failure could cause economic or environmental damage. Learn more.

Physical Details

Dam Height 54 ft (taller than 93.2% in IL)
Dam Length8,400 ft
Dam TypeEarth
Max Storage3.9K acre-ft
Normal Storage3.5K acre-ft
Surface Area106 acres
Drainage Area0 sq mi
Max Discharge19 cfs
Year Completed1985 (41 years old)
NID IDIL50061

Safety Information

Significant Hazard

No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: July 7, 2023
State Regulated: Yes
Regulatory Agency: IDNR

Ownership

SPRINGFIELD COAL COMPANY, LLC

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Springfield Coal/Orient 6 /South Slurry Cell Dam?

Springfield Coal/Orient 6 /South Slurry Cell Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Springfield Coal/Orient 6 /South Slurry Cell Dam?

Springfield Coal/Orient 6 /South Slurry Cell Dam is owned by SPRINGFIELD COAL COMPANY, LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Springfield Coal/Orient 6 /South Slurry Cell Dam built?

Springfield Coal/Orient 6 /South Slurry Cell Dam was completed in 1985, making it 41 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Springfield Coal/Orient 6 /South Slurry Cell Dam?

Springfield Coal/Orient 6 /South Slurry Cell Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Springfield Coal/Orient 6 /South Slurry Cell Dam?

Springfield Coal/Orient 6 /South Slurry Cell Dam has a dam height of 54 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Springfield Coal/Orient 6 /South Slurry Cell Dam last inspected?

Springfield Coal/Orient 6 /South Slurry Cell Dam was last inspected on July 7, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.