South Sediment Pond Dam
Key Takeaway
South Sediment Pond Dam is classified as significant hazard in Missouri. It was completed in 1993 and is 33 years old. Its primary use is other. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 63 ft (taller than 97.7% in MO) |
| Dam Length | 300 ft |
| Dam Type | Earth |
| Max Storage | 5 acre-ft |
| Normal Storage | 4 acre-ft |
| Surface Area | 1 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 130 cfs |
| Year Completed | 1993 (33 years old) |
| Year Modified | 1997 |
| NID ID | MO32035 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
WASTE MAN. OF MO INC.
Private
Nearby Dams
Dougherty Dam
Gasconade, MO
Low Hazard 34 ftKerry Brehe Dam
Gasconade, MO
Low Hazard 26 ftLake Northwoods Dam West
Gasconade, MO
Low Hazard 33 ftLake Northwoods Dam
Gasconade, MO
High Hazard 50 ftAhmad Lake Dam
Gasconade, MO
Low Hazard 25 ftTerry Jordan Lake Dam
Gasconade, MO
Significant Hazard 33 ftBecker Lake Dam
Gasconade, MO
Low Hazard 30 ftLake Timber Ridge Dam
Gasconade, MO
High Hazard 43 ftFrequently Asked Questions
What is the hazard classification of South Sediment Pond Dam?
South Sediment Pond Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates South Sediment Pond Dam?
South Sediment Pond Dam is owned by WASTE MAN. OF MO INC. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was South Sediment Pond Dam built?
South Sediment Pond Dam was completed in 1993, making it 33 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of South Sediment Pond Dam?
South Sediment Pond Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is South Sediment Pond Dam?
South Sediment Pond Dam has a dam height of 63 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was South Sediment Pond Dam last inspected?
South Sediment Pond Dam was last inspected on January 19, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.