Shearon Harris Auxiliary Reservoir Dam
Key Takeaway
Shearon Harris Auxiliary Reservoir Dam is classified as low hazard in North Carolina. It was completed in 1979 and is 47 years old. Its primary use is other.
Physical Details
| Dam Height | 50 ft (taller than 66% in NC) |
| Dam Length | 3,900 ft |
| Dam Type | Rockfill |
| Max Storage | 7.2K acre-ft |
| Normal Storage | 5.0K acre-ft |
| Surface Area | 403 acres |
| Drainage Area | 2 sq mi |
| Max Discharge | 5,030 cfs |
| Year Completed | 1979 (47 years old) |
| NID ID | NC83102 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
CAROLINA POWER AND LIGHT
Public Utility
Nearby Dams
Vinfast Dry Pond Dam #3
Chatham, NC
High HazardVinfast Dry Pond Dam #2
Chatham, NC
High HazardVinfast Dry Pond Dam #6
Chatham, NC
High HazardVinfast Dry Pond Dam #1
Chatham, NC
High HazardVinfast Dry Pond Dam #4
Chatham, NC
High HazardVinfast Dry Pond Dam #5
Chatham, NC
High HazardShearon Harris Nuclear Power Plant Main Dam
Chatham, NC
Significant HazardCapital Kiwannis Club Lake Dam
Chatham, NC
Low HazardFrequently Asked Questions
What is the hazard classification of Shearon Harris Auxiliary Reservoir Dam?
Shearon Harris Auxiliary Reservoir Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Shearon Harris Auxiliary Reservoir Dam?
Shearon Harris Auxiliary Reservoir Dam is owned by CAROLINA POWER AND LIGHT (Public Utility). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Shearon Harris Auxiliary Reservoir Dam built?
Shearon Harris Auxiliary Reservoir Dam was completed in 1979, making it 47 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Shearon Harris Auxiliary Reservoir Dam?
Shearon Harris Auxiliary Reservoir Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Shearon Harris Auxiliary Reservoir Dam?
Shearon Harris Auxiliary Reservoir Dam has a dam height of 50 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Shearon Harris Auxiliary Reservoir Dam last inspected?
Shearon Harris Auxiliary Reservoir Dam was last inspected on June 5, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.