Shealy Lake Dam Lower
Key Takeaway
Shealy Lake Dam Lower is classified as significant hazard in North Carolina. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Length | 203 ft |
| Dam Type | Earth |
| Max Storage | 18 acre-ft |
| Normal Storage | 15 acre-ft |
| Surface Area | 2 acres |
| NID ID | NC03035 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Still Waters Property, LLC
Private
Nearby Dams
Shealy Lake Dam Upper
Henderson, NC
High HazardLake Wood Dam
Henderson, NC
Significant HazardHendersonville Country Club Dam
Henderson, NC
High HazardDrake Dam
Henderson, NC
Significant HazardLaurel Park Lake Dam
Henderson, NC
High HazardRoss Pond Dam
Henderson, NC
High HazardRainbow Spring Lake Dam
Henderson, NC
High HazardEcho Lake Dam
Henderson, NC
High HazardFrequently Asked Questions
What is the hazard classification of Shealy Lake Dam Lower?
Shealy Lake Dam Lower is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Shealy Lake Dam Lower?
Shealy Lake Dam Lower is owned by Still Waters Property, LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Shealy Lake Dam Lower?
Shealy Lake Dam Lower serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Shealy Lake Dam Lower last inspected?
Shealy Lake Dam Lower was last inspected on May 3, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.