Shaker Mill Pond Dam is classified as significant hazard in Massachusetts. It was completed in 2006 and is 20 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 15 ft (taller than 48.8% in MA) |
| Dam Length | 190 ft |
| Dam Type | Masonry |
| Max Storage | 50 acre-ft |
| Normal Storage | 30 acre-ft |
| Surface Area | 0 acres |
| Drainage Area | 1 sq mi |
| Year Completed | 2006 (20 years old) |
| NID ID | MA00714 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
MARGARET HOWARD & SIDNEY URQUHART DBA HOWARD-JERUSALEM ROAD, LLC
Private
Nearby Dams
Steadman Pond Dam
Berkshire, MA
Low Hazard 17 ftGoose Pond Dam
Berkshire, MA
High Hazard 28 ftLake Garfield Dam
Berkshire, MA
High Hazard 20 ftHigley Brook Dam
Berkshire, MA
Low Hazard 12 ftHayes Pond Dam
Berkshire, MA
Low Hazard 12 ftStevens Lake Dam
Berkshire, MA
Significant Hazard 9 ftHurlbut Dam
Berkshire, MA
Significant Hazard 24 ftGreenwater Pond Dam
Berkshire, MA
Significant Hazard 18 ftFrequently Asked Questions
What is the hazard classification of Shaker Mill Pond Dam?
Shaker Mill Pond Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Shaker Mill Pond Dam?
Shaker Mill Pond Dam is owned by MARGARET HOWARD & SIDNEY URQUHART DBA HOWARD-JERUSALEM ROAD, LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Shaker Mill Pond Dam built?
Shaker Mill Pond Dam was completed in 2006, making it 20 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Shaker Mill Pond Dam?
Shaker Mill Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Shaker Mill Pond Dam?
Shaker Mill Pond Dam has a dam height of 15 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Shaker Mill Pond Dam last inspected?
Shaker Mill Pond Dam was last inspected on June 15, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.