Settling Area No 1
Key Takeaway
Settling Area No 1 is classified as significant hazard in Florida. It was completed in 1962 and is 64 years old. Its primary use is tailings. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 18 ft (taller than 43.2% in FL) |
| Dam Length | 2,350 ft |
| Dam Type | Earth |
| Max Storage | 51 acre-ft |
| Normal Storage | 51 acre-ft |
| Surface Area | 3 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 1962 (64 years old) |
| NID ID | FL00630 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
THE MOSAIC COMPANY
Private
Nearby Dams
Bradley Junction S
Polk, FL
Significant Hazard 100 ftPol24
Polk, FL
Unknown 13 ftPol23
Polk, FL
Unknown 6 ftSettling Area No 3
Polk, FL
Significant Hazard 16 ftSettling Area No 2
Polk, FL
Significant Hazard 17 ftBradley Junction S (Ctr)
Polk, FL
Significant Hazard 100 ftBradley Junction E (Ctr)
Polk, FL
Significant Hazard 100 ftBradley Junction Ne
Polk, FL
Significant Hazard 100 ftFrequently Asked Questions
What is the hazard classification of Settling Area No 1?
Settling Area No 1 is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Settling Area No 1?
Settling Area No 1 is owned by THE MOSAIC COMPANY (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Settling Area No 1 built?
Settling Area No 1 was completed in 1962, making it 64 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Settling Area No 1?
Settling Area No 1 serves the following purposes: Tailings. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Settling Area No 1?
Settling Area No 1 has a dam height of 18 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.