Settlers Ridge Pond 1 Dam

BLACKBERRY CREEK· Kane, Illinois· Built 2006· Earth· 9 ft tall
Low Hazard Flood Risk Reduction Private

Key Takeaway

Settlers Ridge Pond 1 Dam is classified as low hazard in Illinois. It was completed in 2006 and is 20 years old. Its primary use is flood risk reduction.

Physical Details

Dam Height 9 ft (taller than 3.9% in IL)
Dam Length1,420 ft
Dam TypeEarth
Max Storage195 acre-ft
Normal Storage63 acre-ft
Surface Area11 acres
Drainage Area2 sq mi
Max Discharge199 cfs
Year Completed2006 (20 years old)
NID IDIL55107

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: October 26, 2022
State Regulated: Yes
Regulatory Agency: IDNR

Ownership

KIMBALL HILL HOMES

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Settlers Ridge Pond 1 Dam?

Settlers Ridge Pond 1 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Settlers Ridge Pond 1 Dam?

Settlers Ridge Pond 1 Dam is owned by KIMBALL HILL HOMES (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Settlers Ridge Pond 1 Dam built?

Settlers Ridge Pond 1 Dam was completed in 2006, making it 20 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Settlers Ridge Pond 1 Dam?

Settlers Ridge Pond 1 Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Settlers Ridge Pond 1 Dam?

Settlers Ridge Pond 1 Dam has a dam height of 9 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Settlers Ridge Pond 1 Dam last inspected?

Settlers Ridge Pond 1 Dam was last inspected on October 26, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.