Sediment Pond 1d-06
Key Takeaway
Sediment Pond 1d-06 is classified as low hazard in Louisiana. Its primary use is other.
Physical Details
| Dam Height | 11 ft (taller than 16.4% in LA) |
| Dam Length | 770 ft |
| Dam Type | Earth |
| Max Storage | 293 acre-ft |
| NID ID | LA83457 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Dolet Hills Mining Venture
Private
Nearby Dams
Sediment Pond 97-E5
Red River, LA
Low Hazard 31 ftCleco Ash Pond Dam
De Soto, LA
Low Hazard 20 ftRawhide Creek Dam
Natchitoches, LA
Low Hazard 36 ftRgf Pond
De Soto, LA
Low Hazard 16 ftFive Farms Lake
De Soto, LA
Low Hazard 16 ftWells Family Pond
Natchitoches, LA
Low Hazard 21 ftDolet Hills Make-Up Water Pond
De Soto, LA
High Hazard 46 ftBell Lake
De Soto, LA
Low Hazard 13 ftFrequently Asked Questions
What is the hazard classification of Sediment Pond 1d-06?
Sediment Pond 1d-06 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Sediment Pond 1d-06?
Sediment Pond 1d-06 is owned by Dolet Hills Mining Venture (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Sediment Pond 1d-06?
Sediment Pond 1d-06 serves the following purposes: Other, Water Supply. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Sediment Pond 1d-06?
Sediment Pond 1d-06 has a dam height of 11 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Sediment Pond 1d-06 last inspected?
Sediment Pond 1d-06 was last inspected on February 10, 2011. Inspection dates indicate when a formal review occurred, not the results of that inspection.