Saganashkee Slough 2 Dam

TRIB CALUMET SAG CHANNEL· Cook, Illinois· Built 1948· Earth· 8 ft tall
Low Hazard Recreation Local Government

Key Takeaway

Saganashkee Slough 2 Dam is classified as low hazard in Illinois. It was completed in 1948 and is 78 years old. Its primary use is recreation.

Physical Details

Dam Height 8 ft (taller than 2.5% in IL)
Dam Length30 ft
Dam TypeEarth
Max Storage2.4K acre-ft
Normal Storage718 acre-ft
Year Completed1948 (78 years old)
NID IDIL01212

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: October 2, 2023
State Regulated: Yes
Regulatory Agency: IDNR

Ownership

FOREST PRESERVE DISTRICT OF COOK COUNTY

Local Government

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Saganashkee Slough 2 Dam?

Saganashkee Slough 2 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Saganashkee Slough 2 Dam?

Saganashkee Slough 2 Dam is owned by FOREST PRESERVE DISTRICT OF COOK COUNTY (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Saganashkee Slough 2 Dam built?

Saganashkee Slough 2 Dam was completed in 1948, making it 78 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Saganashkee Slough 2 Dam?

Saganashkee Slough 2 Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Saganashkee Slough 2 Dam?

Saganashkee Slough 2 Dam has a dam height of 8 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Saganashkee Slough 2 Dam last inspected?

Saganashkee Slough 2 Dam was last inspected on October 2, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.