Ruby Miller Dam
Key Takeaway
Ruby Miller Dam is classified as low hazard in Louisiana. It was completed in 1949 and is 77 years old. Its primary use is fire protection.
Physical Details
| Dam Height | 12 ft (taller than 19% in LA) |
| Dam Length | 1,335 ft |
| Dam Type | Earth |
| Max Storage | 61 acre-ft |
| Normal Storage | 50 acre-ft |
| Surface Area | 10 acres |
| Drainage Area | 2 sq mi |
| Max Discharge | 420 cfs |
| Year Completed | 1949 (77 years old) |
| NID ID | LA00422 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
William Miller
Private
Nearby Dams
Frequently Asked Questions
What is the hazard classification of Ruby Miller Dam?
Ruby Miller Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Ruby Miller Dam?
Ruby Miller Dam is owned by William Miller (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Ruby Miller Dam built?
Ruby Miller Dam was completed in 1949, making it 77 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Ruby Miller Dam?
Ruby Miller Dam serves the following purposes: Fire Protection, Stock, Or Small Fish Pond, Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Ruby Miller Dam?
Ruby Miller Dam has a dam height of 12 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Ruby Miller Dam last inspected?
Ruby Miller Dam was last inspected on February 22, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.