Rosemeyer
Key Takeaway
Rosemeyer is classified as low hazard in Wisconsin. It was completed in 1973 and is 53 years old.
Physical Details
| Dam Height | 18 ft (taller than 55.3% in WI) |
| Dam Length | 615 ft |
| Dam Type | Earth |
| Max Storage | 250 acre-ft |
| Normal Storage | 74 acre-ft |
| Surface Area | 19 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 60 cfs |
| Year Completed | 1973 (53 years old) |
| NID ID | WI00969 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Rosemeyer, Trevor
Private
Nearby Dams
Euclid Wildlife Pond
Taylor, WI
Low Hazard 16 ftGollon, Bill
Taylor, WI
Low Hazard 11 ftPropst
Taylor, WI
Low Hazard 14 ftRaciborski
Taylor, WI
Low Hazard 17 ftOtter Lake
Chippewa, WI
Low Hazard 25 ftTobola
Clark, WI
Low Hazard 23 ftStanley Mill
Chippewa, WI
Significant Hazard 22 ftChequamegon Waters
Taylor, WI
High Hazard 22 ftFrequently Asked Questions
What is the hazard classification of Rosemeyer?
Rosemeyer is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Rosemeyer?
Rosemeyer is owned by Rosemeyer, Trevor (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Rosemeyer built?
Rosemeyer was completed in 1973, making it 53 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
How tall is Rosemeyer?
Rosemeyer has a dam height of 18 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Rosemeyer last inspected?
Rosemeyer was last inspected on July 26, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.