Robin Lake Estates Dam A
Key Takeaway
Robin Lake Estates Dam A is classified as high hazard in North Carolina. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 590 ft |
| Dam Type | Earth |
| Max Storage | 125 acre-ft |
| Normal Storage | 53 acre-ft |
| Surface Area | 8 acres |
| Drainage Area | 325 sq mi |
| Max Discharge | 422 cfs |
| NID ID | NC01278 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Robin Lake Estates Association, Inc.
Private
Nearby Dams
Robin Lake Estates Dam B
Wayne, NC
Low HazardDurhams Lake Dam
Wayne, NC
Low HazardSleepy Creek Upper Lake Dam
Wayne, NC
High HazardSleepy Creek Lake Lower Dam
Wayne, NC
High HazardMt. Olive Waste Water Treatment Plant #1 Dam
Wayne, NC
Low HazardMt. Olive Waste Water Treatment Plant #2 Dam
Wayne, NC
High HazardMac Farms Lagoon Dam
Duplin, NC
Significant HazardWilliams Millpond Dam
Wayne, NC
High HazardFrequently Asked Questions
What is the hazard classification of Robin Lake Estates Dam A?
Robin Lake Estates Dam A is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Robin Lake Estates Dam A?
Robin Lake Estates Dam A is owned by Robin Lake Estates Association, Inc. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Robin Lake Estates Dam A?
Robin Lake Estates Dam A serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Robin Lake Estates Dam A last inspected?
Robin Lake Estates Dam A was last inspected on May 10, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.