Red Hill Quartz Plant Dam

UT to North Toe River· Mitchell, North Carolina· Built 1997· Earth·
High Hazard Irrigation Private

Key Takeaway

Red Hill Quartz Plant Dam is classified as high hazard in North Carolina. It was completed in 1997 and is 29 years old. Its primary use is irrigation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Length235 ft
Dam TypeEarth
Max Storage95 acre-ft
Normal Storage65 acre-ft
Surface Area5 acres
Drainage Area66 sq mi
Year Completed1997 (29 years old)
NID IDNC05453

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: September 14, 2017
State Regulated: Yes
Regulatory Agency: NCDEQ, DEMLR, Dam Safety Program

Ownership

Sibelco North America, Inc.

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Red Hill Quartz Plant Dam?

Red Hill Quartz Plant Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Red Hill Quartz Plant Dam?

Red Hill Quartz Plant Dam is owned by Sibelco North America, Inc. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Red Hill Quartz Plant Dam built?

Red Hill Quartz Plant Dam was completed in 1997, making it 29 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Red Hill Quartz Plant Dam?

Red Hill Quartz Plant Dam serves the following purposes: Irrigation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

When was Red Hill Quartz Plant Dam last inspected?

Red Hill Quartz Plant Dam was last inspected on September 14, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.