Quail Creek South Dam
Key Takeaway
Quail Creek South Dam is classified as high hazard in Utah. It was completed in 1990 and is 36 years old. Its primary use is water supply. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 2,050 ft |
| Dam Type | Gravity |
| Max Storage | 37.0K acre-ft |
| Normal Storage | 33.0K acre-ft |
| Drainage Area | 78 sq mi |
| Max Discharge | 1,000 cfs |
| Year Completed | 1990 (36 years old) |
| NID ID | UT00710 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
WASHINGTON COUNTY WATER CONSERVANCY DIST
Local Government
Nearby Dams
Quail Creek
Washington, UT
High HazardSand Hollow North Dam
Washington, UT
High HazardSand Hollow West Dam
Washington, UT
High HazardSummit Development, Pond N6
Washington, UT
Significant HazardSummit Development, Pond N8
Washington, UT
Significant HazardSummit Development, Pond N10
Washington, UT
Significant HazardStirling, David H. 97-81-07md
Washington, UT
Low HazardSitla - Sienna Hills
Washington, UT
Low HazardFrequently Asked Questions
What is the hazard classification of Quail Creek South Dam?
Quail Creek South Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Quail Creek South Dam?
Quail Creek South Dam is owned by WASHINGTON COUNTY WATER CONSERVANCY DIST (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Quail Creek South Dam built?
Quail Creek South Dam was completed in 1990, making it 36 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Quail Creek South Dam?
Quail Creek South Dam serves the following purposes: Water Supply. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Quail Creek South Dam last inspected?
Quail Creek South Dam was last inspected on October 24, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.