Quadrant East Campus Parcel 1
Key Takeaway
Quadrant East Campus Parcel 1 is classified as significant hazard in Washington. It was completed in 2000 and is 26 years old. Its primary use is flood risk reduction. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Length | 380 ft |
| Dam Type | Earth |
| Max Storage | 11 acre-ft |
| Normal Storage | 1 acre-ft |
| Drainage Area | 0 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 2000 (26 years old) |
| NID ID | WA01815 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
East Campus Corporate Park c/o Kidder Mathews
Private
Nearby Dams
Weyerhaeuser Dam
King, WA
Low HazardSouth 336th Street Stormwater Dam No 2
King, WA
High HazardSouth 336th Street Stormwater Dam No 1
King, WA
High HazardQuadrant Lake No 1
King, WA
Low HazardBoeing Auburn Drainage Ditch Detention D
King, WA
Low HazardPanther Lk First Avenue Bas Detent Pond
King, WA
High HazardPanther Lake Ballfield Dam
King, WA
High HazardPanther Lake Detention Dam
King, WA
High HazardFrequently Asked Questions
What is the hazard classification of Quadrant East Campus Parcel 1?
Quadrant East Campus Parcel 1 is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Quadrant East Campus Parcel 1?
Quadrant East Campus Parcel 1 is owned by East Campus Corporate Park c/o Kidder Mathews (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Quadrant East Campus Parcel 1 built?
Quadrant East Campus Parcel 1 was completed in 2000, making it 26 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Quadrant East Campus Parcel 1?
Quadrant East Campus Parcel 1 serves the following purposes: Flood Risk Reduction, Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Quadrant East Campus Parcel 1 last inspected?
Quadrant East Campus Parcel 1 was last inspected on December 3, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.