Pend Oreille Mine Nw Tailings Dam

Offstream - Pend Oreille R.· Pend Oreille, Washington· Built 2003· Earth·
Significant Hazard Tailings Private

Key Takeaway

Pend Oreille Mine Nw Tailings Dam is classified as significant hazard in Washington. It was completed in 2003 and is 23 years old. Its primary use is tailings. Significant hazard means failure could cause economic or environmental damage. Learn more.

Physical Details

Dam Length800 ft
Dam TypeEarth
Max Storage2.9K acre-ft
Normal Storage2.7K acre-ft
Surface Area3 acres
Drainage Area0 sq mi
Max Discharge0 cfs
Year Completed2003 (23 years old)
Year Modified2003
NID IDWA00640

Safety Information

Significant Hazard

No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: September 19, 2023
State Regulated: Yes
Regulatory Agency: Washington Dept of Ecology

Ownership

Teck Washington Incorporated

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Pend Oreille Mine Nw Tailings Dam?

Pend Oreille Mine Nw Tailings Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Pend Oreille Mine Nw Tailings Dam?

Pend Oreille Mine Nw Tailings Dam is owned by Teck Washington Incorporated (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Pend Oreille Mine Nw Tailings Dam built?

Pend Oreille Mine Nw Tailings Dam was completed in 2003, making it 23 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Pend Oreille Mine Nw Tailings Dam?

Pend Oreille Mine Nw Tailings Dam serves the following purposes: Tailings. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

When was Pend Oreille Mine Nw Tailings Dam last inspected?

Pend Oreille Mine Nw Tailings Dam was last inspected on September 19, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.