Park Creek Pond
Key Takeaway
Park Creek Pond is classified as low hazard in Wisconsin. It was completed in 1972 and is 54 years old. Its primary use is other.
Physical Details
| Dam Height | 12 ft (taller than 30.4% in WI) |
| Dam Length | 470 ft |
| Dam Type | Earth |
| Max Storage | 60 acre-ft |
| Normal Storage | 30 acre-ft |
| Surface Area | 11 acres |
| Drainage Area | 3 sq mi |
| Max Discharge | 284 cfs |
| Year Completed | 1972 (54 years old) |
| NID ID | WI00461 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Douglas County
Local Government
Nearby Dams
Frequently Asked Questions
What is the hazard classification of Park Creek Pond?
Park Creek Pond is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Park Creek Pond?
Park Creek Pond is owned by Douglas County (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Park Creek Pond built?
Park Creek Pond was completed in 1972, making it 54 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Park Creek Pond?
Park Creek Pond serves the following purposes: Other, Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Park Creek Pond?
Park Creek Pond has a dam height of 12 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Park Creek Pond last inspected?
Park Creek Pond was last inspected on September 24, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.