Panasoffkee Cdf-Cell1
Key Takeaway
Panasoffkee Cdf-Cell1 is classified as significant hazard in Florida. It was completed in 2004 and is 22 years old. Its primary use is tailings. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 20 ft (taller than 48.9% in FL) |
| Dam Length | 8,200 ft |
| Dam Type | Earth |
| Max Storage | 3.0K acre-ft |
| Normal Storage | 0 acre-ft |
| Surface Area | 180 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 10 cfs |
| Year Completed | 2004 (22 years old) |
| NID ID | FL19001 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
SWFWMD
State Government
Nearby Dams
Panasoffkee Cdf-Polishing Pond
Sumter, FL
Significant Hazard 20 ftPanasoffkee Cdf-Cell2
Sumter, FL
Significant Hazard 20 ftRufe Wysong Dam and Navigation Lock
Sumter, FL
Low Hazard 15 ftLeslie Heifner
Citrus, FL
Significant Hazard 13 ftFloral City
Citrus, FL
Significant Hazard 7 ftMoccasin Slough Structure
Citrus, FL
Low Hazard 11 ftGolf Course
Citrus, FL
Low Hazard 6 ftFrequently Asked Questions
What is the hazard classification of Panasoffkee Cdf-Cell1?
Panasoffkee Cdf-Cell1 is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Panasoffkee Cdf-Cell1?
Panasoffkee Cdf-Cell1 is owned by SWFWMD (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Panasoffkee Cdf-Cell1 built?
Panasoffkee Cdf-Cell1 was completed in 2004, making it 22 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Panasoffkee Cdf-Cell1?
Panasoffkee Cdf-Cell1 serves the following purposes: Tailings. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Panasoffkee Cdf-Cell1?
Panasoffkee Cdf-Cell1 has a dam height of 20 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Panasoffkee Cdf-Cell1 last inspected?
Panasoffkee Cdf-Cell1 was last inspected on June 10, 2005. Inspection dates indicate when a formal review occurred, not the results of that inspection.