Newcastle Vista Pond 3
Key Takeaway
Newcastle Vista Pond 3 is classified as high hazard in Washington. It was completed in 2012 and is 14 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 700 ft |
| Dam Type | Earth |
| Max Storage | 20 acre-ft |
| Normal Storage | 3 acre-ft |
| Surface Area | 0 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 870 cfs |
| Year Completed | 2012 (14 years old) |
| Year Modified | 2008 |
| NID ID | WA01908 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Newcastle City Public Works
Local Government
Nearby Dams
Newcastle Railroad Embankment Dam
King, WA
High HazardI405 Coal Creek Stormwater Detention Da
King, WA
Low HazardLakemont Stormwater Pond
King, WA
High HazardMadsen Creek West Basin Dam
King, WA
High HazardBellevue Detention Pond 133
King, WA
Low HazardBellevue Detention Pond 165
King, WA
Low HazardBellevue Detention Pond 179 North
King, WA
Low HazardBellevue Detention Pond 197
King, WA
Low HazardFrequently Asked Questions
What is the hazard classification of Newcastle Vista Pond 3?
Newcastle Vista Pond 3 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Newcastle Vista Pond 3?
Newcastle Vista Pond 3 is owned by Newcastle City Public Works (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Newcastle Vista Pond 3 built?
Newcastle Vista Pond 3 was completed in 2012, making it 14 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Newcastle Vista Pond 3?
Newcastle Vista Pond 3 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Newcastle Vista Pond 3 last inspected?
Newcastle Vista Pond 3 was last inspected on October 18, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.