New Pond Dam
Key Takeaway
New Pond Dam is classified as significant hazard in Massachusetts. It was completed in 1810 and is 216 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 14 ft (taller than 45.2% in MA) |
| Dam Length | 860 ft |
| Dam Type | Masonry |
| Max Storage | 343 acre-ft |
| Normal Storage | 119 acre-ft |
| Surface Area | 17 acres |
| Drainage Area | 5 sq mi |
| Year Completed | 1810 (216 years old) |
| NID ID | MA00779 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
TOWN OF EASTON, BOARD OF SELECTMEN
Local Government
Nearby Dams
Old Cabot Pond Dam
Bristol, MA
Significant Hazard 10 ftCanoe River Campground Dam
Bristol, MA
Significant Hazard 10 ftLeach Pond Dam
Bristol, MA
Low Hazard 7 ftPud's Pond Dam
Norfolk, MA
Low Hazard 12 ftUpper Leach Pond Dike #1
Norfolk, MA
Low Hazard 7 ftUpper Leach Pond Dike #2
Norfolk, MA
Low Hazard 8 ftBorderland S.P. Dam #2
Norfolk, MA
Low Hazard 14 ftMill Pond Dam
Bristol, MA
Significant Hazard 9 ftFrequently Asked Questions
What is the hazard classification of New Pond Dam?
New Pond Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates New Pond Dam?
New Pond Dam is owned by TOWN OF EASTON, BOARD OF SELECTMEN (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was New Pond Dam built?
New Pond Dam was completed in 1810, making it 216 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of New Pond Dam?
New Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is New Pond Dam?
New Pond Dam has a dam height of 14 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was New Pond Dam last inspected?
New Pond Dam was last inspected on May 30, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.