New Pond Dam
Key Takeaway
New Pond Dam is classified as significant hazard in Connecticut. It was completed in 1900 and is 126 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 13 ft (taller than 50.2% in CT) |
| Dam Length | 180 ft |
| Dam Type | Earth |
| Normal Storage | 58 acre-ft |
| Surface Area | 12 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 35 cfs |
| Year Completed | 1900 (126 years old) |
| NID ID | CT01662 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Calvin R. & Elwin C. Bradway
Private
Nearby Dams
Stafford Reservoir #3 Dam
Tolland, CT
Significant Hazard 11 ftNipmuck Pond Dam
Tolland, CT
Significant Hazard 10 ftStafford Reservoir #2 Dam
Tolland, CT
Significant Hazard 28 ftNew City Pond Dam
Tolland, CT
Significant Hazard 15 ftPinneys Pond Dam
Tolland, CT
Low Hazard 10 ftStafford Reservoir #4 Dam
Tolland, CT
Significant Hazard 8 ftStaffordville Reservoir Dam
Tolland, CT
High Hazard 30 ftMorey Pond Dam
Windham, CT
Significant Hazard 19 ftFrequently Asked Questions
What is the hazard classification of New Pond Dam?
New Pond Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates New Pond Dam?
New Pond Dam is owned by Calvin R. & Elwin C. Bradway (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was New Pond Dam built?
New Pond Dam was completed in 1900, making it 126 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of New Pond Dam?
New Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is New Pond Dam?
New Pond Dam has a dam height of 13 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was New Pond Dam last inspected?
New Pond Dam was last inspected on September 12, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.