Neustrom Subwatershed Site M-4
Key Takeaway
Neustrom Subwatershed Site M-4 is classified as low hazard in Iowa. It was completed in 1971 and is 55 years old. Its primary use is fire protection.
Physical Details
| Dam Height | 48 ft (taller than 94.1% in IA) |
| Dam Length | 586 ft |
| Dam Type | Earth |
| Max Storage | 311 acre-ft |
| Normal Storage | 102 acre-ft |
| Surface Area | 13 acres |
| Drainage Area | 2 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 1971 (55 years old) |
| NID ID | IA01172 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Woodbury County SWCD
Local Government
Nearby Dams
Neustrom Subwatershed Site 17-2
Woodbury, IA
Low Hazard 39 ftNeustrom Subwatershed Site 19-3
Woodbury, IA
Low Hazard 40 ftNeustrom Subwatershed Site M-3
Woodbury, IA
Low Hazard 25 ftNeustrom Subwatershed Site M-6
Woodbury, IA
Low Hazard 33 ftNeustrom Subwatershed Site 13-2
Woodbury, IA
Low Hazard 39 ftNeustrom Subwatershed Site 13-1
Woodbury, IA
Low Hazard 47 ftNeustrom Subwatershed Site M-1
Woodbury, IA
Low Hazard 30 ftNeustrom Subwatershed Site M-5
Woodbury, IA
Low Hazard 39 ftFrequently Asked Questions
What is the hazard classification of Neustrom Subwatershed Site M-4?
Neustrom Subwatershed Site M-4 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Neustrom Subwatershed Site M-4?
Neustrom Subwatershed Site M-4 is owned by Woodbury County SWCD (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Neustrom Subwatershed Site M-4 built?
Neustrom Subwatershed Site M-4 was completed in 1971, making it 55 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Neustrom Subwatershed Site M-4?
Neustrom Subwatershed Site M-4 serves the following purposes: Fire Protection, Stock, Or Small Fish Pond, Recreation, Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Neustrom Subwatershed Site M-4?
Neustrom Subwatershed Site M-4 has a dam height of 48 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.