Murray Corriher Dam #3 is classified as low hazard in North Carolina. It was completed in 1986 and is 40 years old. Its primary use is irrigation.
Physical Details
| Dam Length | 380 ft |
| Dam Type | Earth |
| Max Storage | 43 acre-ft |
| Normal Storage | 28 acre-ft |
| Surface Area | 3 acres |
| Drainage Area | 42 sq mi |
| Max Discharge | 109 cfs |
| Year Completed | 1986 (40 years old) |
| NID ID | NC04971 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Murray A Corriher
Private
Nearby Dams
Murray Corriher Dam #1
Rowan, NC
Low HazardHoward Hensley Dam
Rowan, NC
High HazardMurray Corriher Dam #2
Rowan, NC
Low HazardLandis Water Reservoir Dam
Rowan, NC
High HazardLake Corriher Dam
Rowan, NC
High HazardStricklin Dam
Rowan, NC
High HazardLandis Lake Dam
Rowan, NC
High HazardLake Kannapolis Dam
Rowan, NC
High HazardFrequently Asked Questions
What is the hazard classification of Murray Corriher Dam #3?
Murray Corriher Dam #3 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Murray Corriher Dam #3?
Murray Corriher Dam #3 is owned by Murray A Corriher (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Murray Corriher Dam #3 built?
Murray Corriher Dam #3 was completed in 1986, making it 40 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Murray Corriher Dam #3?
Murray Corriher Dam #3 serves the following purposes: Irrigation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Murray Corriher Dam #3 last inspected?
Murray Corriher Dam #3 was last inspected on December 15, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.