Muddy Creek Dam #2-C
Key Takeaway
Muddy Creek Dam #2-C is classified as significant hazard in North Carolina. It was completed in 1972 and is 54 years old. Its primary use is flood risk reduction. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Length | 659 ft |
| Dam Type | Earth |
| Max Storage | 874 acre-ft |
| Normal Storage | 86 acre-ft |
| Surface Area | 12 acres |
| Year Completed | 1972 (54 years old) |
| NID ID | NC00357 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
McDowell Soil and Water Conservation District
Local Government
Nearby Dams
Muddy Creek Dam #3
McDowell, NC
High HazardMuddy Creek Dam #4
McDowell, NC
Significant HazardMarimont Lower Dam
McDowell, NC
Significant HazardMarimont Upper Dam
McDowell, NC
Significant HazardSecond Broad River WS #11-6a Dam
McDowell, NC
Low HazardEstes Lake Dam
McDowell, NC
Significant HazardSecond Broad River WS #11-5 Dam
McDowell, NC
Significant HazardMuddy Creek Dam #6-B
McDowell, NC
Significant HazardFrequently Asked Questions
What is the hazard classification of Muddy Creek Dam #2-C?
Muddy Creek Dam #2-C is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Muddy Creek Dam #2-C?
Muddy Creek Dam #2-C is owned by McDowell Soil and Water Conservation District (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Muddy Creek Dam #2-C built?
Muddy Creek Dam #2-C was completed in 1972, making it 54 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Muddy Creek Dam #2-C?
Muddy Creek Dam #2-C serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Muddy Creek Dam #2-C last inspected?
Muddy Creek Dam #2-C was last inspected on March 30, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.