Msd Treatment Plant Dam
Key Takeaway
Msd Treatment Plant Dam is classified as high hazard in North Carolina. It was completed in 1967 and is 59 years old. Its primary use is other. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Length | 320 ft |
| Dam Type | Rockfill |
| Max Storage | 385 acre-ft |
| Normal Storage | 276 acre-ft |
| Surface Area | 11 acres |
| Drainage Area | 97 sq mi |
| Year Completed | 1967 (59 years old) |
| NID ID | NC00320 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Metropolitan Sewer District Buncombe County
Local Government
Nearby Dams
Craggy Dam
Buncombe, NC
Low Hazard 13 ftBeaver Lake Dam
Buncombe, NC
High HazardWoodland Hills Dam
Buncombe, NC
High HazardNorth Buncombe Quarry Sb No. 7 Dam
Buncombe, NC
High HazardLake Louise Dam
Buncombe, NC
Significant HazardKyfields Condominiums Dam
Buncombe, NC
High HazardRoddy Dam
Buncombe, NC
High HazardFreedom Lake Dam
Buncombe, NC
High HazardFrequently Asked Questions
What is the hazard classification of Msd Treatment Plant Dam?
Msd Treatment Plant Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Msd Treatment Plant Dam?
Msd Treatment Plant Dam is owned by Metropolitan Sewer District Buncombe County (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Msd Treatment Plant Dam built?
Msd Treatment Plant Dam was completed in 1967, making it 59 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Msd Treatment Plant Dam?
Msd Treatment Plant Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Msd Treatment Plant Dam last inspected?
Msd Treatment Plant Dam was last inspected on March 23, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.