Mother Earth Dam Upper
Key Takeaway
Mother Earth Dam Upper is classified as significant hazard in North Carolina. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Length | 120 ft |
| Dam Type | Earth |
| Max Storage | 23 acre-ft |
| Normal Storage | 18 acre-ft |
| Surface Area | 2 acres |
| NID ID | NC01375 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Jane Shuttleworth
Private
Nearby Dams
Mother Earth Dam Lower
Transylvania, NC
Significant HazardTurkey Pen Farm Dam
Transylvania, NC
High HazardLewis Dam
Transylvania, NC
High HazardLaurel Lake Dam
Transylvania, NC
High HazardBass Lake Dam
Transylvania, NC
High HazardGaither Pond Dam
Transylvania, NC
High HazardSalter Dam
Transylvania, NC
High HazardForge Mountain Grist Mill Dam
Henderson, NC
High HazardFrequently Asked Questions
What is the hazard classification of Mother Earth Dam Upper?
Mother Earth Dam Upper is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Mother Earth Dam Upper?
Mother Earth Dam Upper is owned by Jane Shuttleworth (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Mother Earth Dam Upper?
Mother Earth Dam Upper serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Mother Earth Dam Upper last inspected?
Mother Earth Dam Upper was last inspected on May 1, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.