Mishe - Mokwa Dam
Key Takeaway
Mishe - Mokwa Dam is classified as high hazard in New Jersey. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 16 ft (taller than 59.4% in NJ) |
| Dam Length | 165 ft |
| Dam Type | Earth |
| Max Storage | 74 acre-ft |
| Normal Storage | 60 acre-ft |
| Surface Area | 11 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 112 cfs |
| NID ID | NJ00419 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Borough of Medford Lakes
Local Government
Nearby Dams
Wagush Levee Dam
Burlington, NJ
High Hazard 8 ftBallinger Lake Dam
Burlington, NJ
High Hazard 11 ftLower Aetna Lake Dam
Burlington, NJ
Significant Hazard 12 ftBig Look Trail Dam
Burlington, NJ
Significant Hazard 10 ftSaipe Lake Dam
Burlington, NJ
Significant Hazard 7 ftSioux Lake Dam
Burlington, NJ
Significant Hazard 12 ftUpper Aetna Lake Dam
Burlington, NJ
Significant Hazard 14 ftCranberry Lakes Dam #5
Burlington, NJ
Significant Hazard 11 ftFrequently Asked Questions
What is the hazard classification of Mishe - Mokwa Dam?
Mishe - Mokwa Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Mishe - Mokwa Dam?
Mishe - Mokwa Dam is owned by Borough of Medford Lakes (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Mishe - Mokwa Dam?
Mishe - Mokwa Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Mishe - Mokwa Dam?
Mishe - Mokwa Dam has a dam height of 16 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Mishe - Mokwa Dam last inspected?
Mishe - Mokwa Dam was last inspected on August 4, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.